              Nagaur District is situated between 260.25” & 270.40” North Latitude & 730.10” & 750.15” East Longitude. It is situated amidst seven districts namely Bikaner, Churu, Sikar, Jaipur, Ajmer, Pali, Jodhpur. Nagaur is the fifth largest district in Rajasthan with a vast territory spreading over 17,718 sq. K.M. Its geographical spread has a good combine of plain, hills, sand mounds & thus it is a part of the great Indian Thar Desert. The present district of Nagaur finds a place in the heart of the Rajasthan state. If we draw a cross over the map of Rajasthan the centre of this cross is bound to fall in the district of Nagaur. Its population is 93887 souls as per census 2001. The town of Ladnu in the district has gained its place on the map of the country due to headquarters of the famous 'Jain Vishwa Bharti' which has become a centre of spiritual learning’s & knowledge under the leadership of Acharya Tulsi, a great Jain saint, who has propagated the philosophy of "ANUVRAT" in order to enlighten people in this area of the country.

 

             To improve infrastructure facilities in the city, proposals for water supply, sewerage, etc. of worth 117.00 Crores have been tentatively identified by line agency concerned/District Administration. District Collector is working for identifying the priority work and deficiencies in the infrastructure sectors in consultation with public representatives.

The various works proposed in Nagaur are as follows: 

 

 
 

S. No.

Description

Estimated Cost (Rs. In Crores)

Tranche

I

II

III

IV

1.

Water Supply

 

 

a.

Construction of OHSRs and CWRs including providing, laying, jointing, testing and commissioning of UPVC and DI pipelines in distribution system and transmission system; construction of pumping stations and ancillary work; replacement of  water meters for UWSS in Nagaur town. 

29.19

II

b.

Additional water supply work in Nagaur

9.60

III

2.

Waste Water

 

 

a.

Design, construction, supply, erection, testing, commissioning and five years operation & maintenance of 8 MLD sewage treatment plant near biwa road and sewage pumping/ lifting station including  all civil, electrical, mechanical, pumping and other allied work and supply, laying, joining, testing and commissioning of outfall sewer, trunk sewers and lateral sewers, along with construction of  manholes, appurtenances etc. at Nagaur.

24.74

II

b.

Additional Sewer line along with restoration of roads, construction of main holes.

35.00

III

3.

Solid Waste management

 

 

 

Development of sanitary landfill site an procurement of SWM equipments

0.83

III

4.

Social Infrastructure

 

 

 

Procurement of fire fighting equipments

0.46

III

5.

Urban Transports and Roads    
  Four Laning bypass road

11.00

III

 

Total

119.00

 


Rajasthan Urban Infrastructure Development Project (RUIDP)

Department Name Development Activities
Rajasthan Urban Infrastructure Development Project (RUIDP)

 

 

Indira Gandhi Lift Canal

                                                                                                                                  

 

 

 

Rajasthan State Road Development and Construction Corporation Ltd. (RSRDC)

 

 

 

RSRDC DEVELOPMENT ACTIVITES